Fal River Diversion:
Constructed in 1996, this bank protection was designed to prevent
erosion of a pinch point.
|
|
 |
Pentewan River Bank Protection:
Constructed in 1998 to protect the river bank and cycleway from
the effects of river erosion and to replace worn timber.
|
|
 |
Tees Barrage:
40,000 tonnes of Rock Armour were used in the construction of
the Tees Barrage, Stockton On Tees, Cleveland.
|
|
 |
River Protection, Cumbria:
For its river protection contract in Cumbria, the NRA specified
Rock Armour from Bardon Aggregates.
|
|
 |
River Wear, Bishop Auckland:
Special 1.5 tonne blocks were used to stop river bank erosion
and protect Newton Cap Road and Rail Viaduct on the River Wear,
Bishop Auckland.
|
|
 |
River Humber Passenger Rail Line:
Bardon Aggregates Rock Armour were used on the bank of the River
Humber to protect the passenger rail line. 70,000 tonnes was supplied
by rail.
|
|
 |